After the concrete collar has been poured, CHP is finished with the pool installation and your site is left with a rough grade. The staging area used to store materials during the pool installation is smoothed out as much as possible but there will likely be some stone left on site. This staging area will now be used by your patio installer.
Please keep in mind that the rough grade does not leave the yard prepared for seeding. Though we try our best to level the yard when we leave other trucks and heavy machinery will be brought on-site to finish your project once we are gone. The remnants of the staging area, the ruts in the ground, and other uneven areas left by contractors will need to be addressed by a landscaper. Normally this is done by bringing in topsoil/loom and then seeded after everything has been completed.
Comentarios